Project HasleTre is a finalist for Oslo City Architecture Prize 2023

HasleTre is demountable and was named Wooden Building of the Year in 2022. The project is now in fierce competition with the National Museum and Hovinbekken for the 2023 Oslo City Architecture Prize, which will be awarded in mid-October. HasleTre is a pioneering project for circular buildings, built in environmentally friendly solid wood and designed to ensure that no materials are wasted. [...]
Seltor has signed a contract with Bertel O. Steen Eiendom AS

Seltor AS will completely renovate and expand the office, canteen, shop and sales area. This part of the building is approx. 2,500 m². A new facade will also be built on the workshop section. The building itself currently consists of a first floor with shop and sales area, and a second floor with office and canteen. The conversion and extension will also include an exhibition and sales [...].
Seltor has signed a contract with Oxer Eiendom

The building is a former industrial premises that will be completely renovated and converted into a theater for performing arts for young people. The building has an area of over 3,350 m² where stages, dressing rooms, mingle areas and rehearsal rooms will be built. The project will be a close collaboration with Kloden Teater, Transborder Studio and Oxer Eiendom. Construction is scheduled to start in Q2 in [...].
Seltor has signed a contract with Lager For Alle AS

The project concerns the construction of warehouse sections in a turnkey contract. A total of 5 separate building units totaling 10,000 m² with a total of 124 warehouse sections will be built. Construction is scheduled to start in August 2023 and will be handed over in Q2 2024.
First project in Norway to use cardboard closures

Sustainability A life cycle analysis conducted by Karlstad University shows that a cardboard stud from Wood Tube emits 14 times less CO3 equivalents compared to a steel stud, which is the most common stud used in construction. In other words, 14 Wood Tube studs can be produced with the same emissions as 1 steel stud. Working environment The cardboard brick has [...].
Our work with the Norwegian Transparency Act. Our work with the Norwegian Transparency Act

Our work with the Transparency Act Factlines confirms that Seltor AS with organization number (Org.nr: 915617344) actively works with basic human rights and decent working conditions in its own operations and supply chain. Siri Engesæth, CEO of Factlines. Supplier mapping Every year, we collect information from our suppliers through Factlines' software. The self-reporting is based on the UN Global Compact and the OECD Guidelines for Responsible Business Conduct [...].
New general manager in Seltor

Maalen comes from the position as production manager at Seltor. Svend-Harald is a trained civil engineer and has held a number of management positions in the construction industry, including Betonmast, Skanska, NCC and GAS. Seltor has experienced strong growth in recent years with approx. Nok in turnover in 2022. The company has gained a central role in the market in Eastern Norway. [...]
Sustainability award for Seltor project

Seltor has been the turnkey contractor and responsible for the delivery of Hasle Tre - Hasle Tre has become a unique property, but the road to the finished building has also been incredible with new innovative solutions. This is Norway's first demountable and reusable wooden office building. The sustainable wooden structure captures excess carbon from the environment. The wood materials also have [...].
Hasle Tre won the award for Wooden Building of the Year 2022

Text and image from Bygg.no The winner of the Wooden Building of the Year 2022 is a building project that uses wood from inside to outside. New solutions have been used and reuse is a guiding principle in all choices. This is a great example of how construction in the future can give content to the term circularity, writes the jury in a [...].
Seltor builds for Statnett in Skien

Statnett has decided to expand the storage capacity at Havnelageret in Skien. The project involves the construction of a new storage building with a floor area of approx. 2,000 m² directly adjacent to the existing storage building of approx. 1,900 m². The existing warehouse will be upgraded in terms of fire class, heating system and technical systems, and will be integrated with the new warehouse. The warehouse will be constructed in accordance with TEK17. The contract sum [...]